§ 40-290. Notice before commencing work; site work; restoration.  


Latest version.
  • (a)

    Permittee shall provide notice to the director no less than 48 hours before commencing work to install or remove a facility. At all times during the installation of any facility within the public street, the roadway(s) shall be kept open by the permittee for vehicular traffic in a reasonable manner, and no obstruction of the sidewalks shall be permitted so as to prevent the use thereof by pedestrians for an unreasonable period of time. Dirt and other material removed during the installation of the facility within the public street shall not be permitted to remain on the public street, and said dirt and other material from the site shall be removed at the risk, liability, and expense of the permittee. All excavations or obstructions of any kind which are permitted during the period of permittee's construction shall be properly barricaded and shall also be well illuminated during the night time.

    (b)

    Upon the revocation or expiration of the permit, if not renewed, the permittee shall remove the facility, close the bore site, and restore the public street to its previous condition at his sole expense. Any facility which has not been removed by the tenth day next following the revocation or expiration of the permit shall be deemed abandoned, and it may be removed by the city without notice to the permittee. Removal of the facility by the city shall be at the sole expense of the permittee and shall be recorded as a charge against the permittee's restoration bond.

(Ord. No. 91-1157, § 1, 8-14-91; Ord. No. 2012-522, § 5, 5-30-2012, eff. 7-1-2012)